BrazilLow importance
Grupo ABL opens Astella in Curitiba, a 3.5 MW data center ready for AI, and plans six more in Brazil
Grupo ABL, with 100% Brazilian capital, presented on Wednesday (11/11) its first data center, Astella, in downtown Curitiba, operating from November. The unit, in a 16-story building that once housed telecom operators, starts with about 3.5 MW and can reach 5 MW. It has liquid cooling and high-density racks for AI and GPU workloads, a solar plant of about 2.7 MWp and more than R$ 150 million invested, with another R$ 30 million by the end of 2026. The company is being accredited with the National Defense and plans R$ 300 million for six new units between 2027 and 2028.
Published in edition no. 26 of Noticiário do Joãozinho ·
Translated by Joãozinho AI from the original Brazilian Portuguese edition. Facts, numbers and sources are the same as in the original; quotes, video titles and source names stay in their original language. Read the original in Portuguese
Original source
https://canaltech.com.br/hardware/grupo-abl-estreia-data-center-de-35-mw-em-curitiba-mirando-soberania-de-dados/